Discoveries

Foster & Associates’ team of uniquely talented explorationists dedicate themselves to diligent regional seismic analysis and geological observation. Our comprehensive research has lead to 191 successful wells being drilled, producing 2,044 BCFE (as of June 2018) with an expected ultimate production of 2,287 BCFE. We are proud to showcase all of the post-1990 discoveries on the map below.

Discoveries Map

BRA 375 W/2
7.4 BCF + 28 MBO
P&A

Prospect: BRA 375 W/2 Wells: 1 Date: 10/9/92 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 7.4 BCF + 28 MBO Estimated Ultimate Recovery: Completed

BRA 376/375
13.4 BCF + 32 MBO
P&A

Prospect: BRA 376/375 Wells: 2 Date: 1/19/99 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 13.4 BCF + 32 MBO Estimated Ultimate Recovery: Completed

BRA 504
10.5 BCF + 30 MBO
P&A

Prospect: BRA 504 Wells: 1 Date: 12/16/93 Status: P&A Method Obtained: Purchase CUMM. PRODUCTION (8/8ths): 10.5 BCF + 30 MBO Estimated Ultimate Recovery: Completed

GAL 225/239
20.0 BCF + 58 MBO
P&A

Prospect: GAL 225/239 Wells: 1 Date: 10/1/98 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 20.0 BCF + 58 MBO Estimated Ultimate Recovery: Completed

GAL 239 N/2
13.6 BCF + 781 MBO
P&A

Prospect: GAL 239 N/2 Wells: 1 Date: 11/29/98 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 13.6 BCF + 781 MBO Estimated Ultimate Recovery: Completed

GAL 210
32.1 BCF + 186 MBO
P&A

Prospect: GAL 210 Wells: 3 Date: 10/23/91 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 32.1 BCF + 186 MBO Estimated Ultimate Recovery: Completed

GAL 227
2.1 BCF + 46 MBO
P&A

Prospect: GAL 227 Wells: 1 Date: 12/10/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.1 BCF + 46 MBO Estimated Ultimate Recovery: Completed

HI 154 S/2
6.8 BCF + 95 MBO
P&A

Prospect: HI 154 S/2 Wells: 1 Date: 5/19/97 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 6.8 BCF + 95 MBO Estimated Ultimate Recovery: Completed

HI 194
53 BCF + 252 MBO
P&A

Prospect: HI 194 Wells: 4 Date: 11/8/96 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 53 BCF + 252 MBO Estimated Ultimate Recovery: Completed

HI 176
5.6 BCF + 460 MBO
FARO 2.5 MMCFGPD + 101 BOPD

Prospect: HI 176 Wells: 1 Date: 1/17/11 Status: FARO 2.5 MMCFGPD + 101 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 5.6 BCF + 460 MBO Estimated Ultimate Recovery: 15 BCFE

HI 138
35.6 BCF + 312 MBO
P&A

Prospect: HI 138 Wells: 2 Date: 6/20/08 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 35.6 BCF + 312 MBO Estimated Ultimate Recovery: Completed

HI 24L
77.4 BCF + 493 MBO
FARO 6.5 MMCFGPD + 109 BOPD

Prospect: HI 24L Wells: 2 Date: 10/16/06 Status: FARO 6.5 MMCFGPD + 109 BOPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths):77.4 BCF + 493 MBO Estimated Ultimate Recovery: 90 BCF

HI 23L
10.4 BCF + 735 MBO
P&A

Prospect: HI 23L Wells: 1 Date: 4/19/08 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.4 BCF + 735 MBO Estimated Ultimate Recovery: Completed

HI 37
36.3 BCF + 77 MBO
P&A

Prospect: HI 37 Wells: 4 Date: 6/3/00 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 36.3 BCF + 77 MBO Estimated Ultimate Recovery: Completed

HI 117
2.7 BCF + 3 MBO
S/I

Prospect: HI 117 Wells: 1 Date: 11/2/13 Status: S/I Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.7 BCF + 3 MBO Estimated Ultimate Recovery: 3 BCFE

HI 74
4.5 BCF + 43 MBO
P&A

Prospect: HI 74 Wells: 2 Date: 12/12/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 4.5 BCF + 43 MBO Estimated Ultimate Recovery: Completed

HI A-171
1.0 BCF + 4 MBO
P&A

Prospect: HI A-171 Wells: 1 Date: 2/25/12 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 1.0 BCF + 4 MBO Estimated Ultimate Recovery: Completed

HISA A-544
10.2 BCF
P&A

Prospect: HISA A-544 Wells: 2 Date: 7/13/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.2 BCF Estimated Ultimate Recovery: Completed

HISA A-356
6.3 BCF + 39 MBO
P&A

Prospect: HISA A-356 Wells: 1 Date: 2/10/98 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 6.3 BCF + 39 MBO Estimated Ultimate Recovery: Completed

HISA A-345
6.2 BCF + 20 MBO
P&A

Prospect: HISA A-345 Wells: 1 Date: 5/30/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 6.2 BCF + 20 MBO Estimated Ultimate Recovery: Completed

HISA A-354
8.7 BCF + 39 MBO
P&A

Prospect: HISA A-354 Wells: 2 Date: 7/1/98 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 8.7 BCF + 39 MBO Estimated Ultimate Recovery: Completed

WC 294
44.5 BCF + 296 MBO
P&A

Prospect: WC 294 Wells: 3 Date: 2/7/01 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 44.5 BCF + 296 MBO Estimated Ultimate Recovery: Completed

WC 293
17.4 BCF + 50 MBO
P&A

Prospect: WC 293 Wells: 2 Date: 9/3/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 17.4 BCF + 50 MBO Estimated Ultimate Recovery: Completed

WC 77/96
42.0 BCF + 623 MBO
FARO 10.4 MMCFGPD + 391 BOPD

Prospect: WC 77/96 Wells: 2 Date: 9/10/04 Status: FARO 10.4 MMCFGPD + 391 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 42.0 BCF + 623 MBO Estimated Ultimate Recovery: 60 BCFE

WC 522
24.8 BCF + 226 MBO
P&A

Prospect: WC 522 Wells: 6 Date: 4/29/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 24.8 BCF + 226 MBO Estimated Ultimate Recovery: Completed

WC 540
24.9 BCF + 16 MBO
P&A

Prospect: WC 540 Wells: 4 Date: 5/23/97 Status: P&A Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 24.9 BCF + 16 MBO Estimated Ultimate Recovery: Completed

WC 182
28.0 BCF + 117 MBO
P&A

Prospect: WC 182 Wells: 2 Date: 10/14/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 28.0 BCF + 117 MBO Estimated Ultimate Recovery: Completed

WC 230
10.3 BCF + 61 MBO
P&A

Prospect: WC 230 Wells: 3 Date: 6/27/92 Status: P&A Method Obtained: Purchase CUMM. PRODUCTION (8/8ths): 10.3 BCF + 61 MBO Estimated Ultimate Recovery: Completed

WC 552
82.4 BCF + 904 MBO
P&A

Prospect: WC 552 Wells: 5 Date: 5/7/94 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 82.4 BCF + 904 MBO Estimated Ultimate Recovery: Completed

EC 34
0.5 BCF + 18 MBO
P&A

Prospect: EC 34 Wells: 1 Date: 11/24/10 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 0.5 BCF + 18 MBO Estimated Ultimate Recovery: Completed

EC 149
23.3 BCF + 80 MBO
P&A

Prospect: EC 149 Wells: 3 Date: 10/10/94 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 23.3 BCF + 80 MBO Estimated Ultimate Recovery: Completed

EC 144
10.9 BCF + 394 MBO
P&A

Prospect: EC 144 Wells: 1 Date: 5/23/00 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.9 BCF + 394 MBO Estimated Ultimate Recovery: Completed

VR 122
13.1 BCF + 335 MBO
J&A

Prospect: VR 122 Wells: 3 Date: 2/26/03 Status: J&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 13.1 BCF + 335 MBO Estimated Ultimate Recovery: Completed

VR 342/341
2.1 BCF + 3.07 MMBO
FARO 1612 BOPD + 1.0 MMCFGPD

Prospect: VR 342/341 Wells: 3 Date: 5/14/06 Status: FARO 1612 BOPD + 1.0 MMCFGPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 2.1 BCF + 3.07 MMBO Estimated Ultimate Recovery: 5 MMBO

VR 225
9.6 BCF + 30 MBO
P&A

Prospect: VR 225 Wells: 2 Date: 7/24/97 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 9.6 BCF + 30 MBO Estimated Ultimate Recovery: Completed

VR 56
4.8 BCF + 1.04 MMBO
FARO 0.2 MMCFGPD + 92 BOPD

Prospect: VR 56 Wells: 1 Date: 3/8/00 Status: FARO 0.2 MMCFGPD + 92 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 4.8 BCF + 1.04 MMBO Estimated Ultimate Recovery: 15 BCFE

VR 296
13.9 BCF + 72 MBO
P&A

Prospect: VR 296 Wells: 1 Date: 5/8/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 13.9 BCF + 72 MBO Estimated Ultimate Recovery: Completed

VR 381
18.2 BCF + 368 MBO
FARO 0.5 MMCFGPD

Prospect: VR 381 Wells: 2 Date: 5/24/00 Status: FARO 0.5 MMCFGPD Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 18.2 BCF + 368 MBO Estimated Ultimate Recovery: 22 BCFE

VR 309
39 BCF + 388 MBO
P&A

Prospect: VR 309 Wells: 8 Date: 4/24/98 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 39 BCF + 388 MBO Estimated Ultimate Recovery: Completed

VR 253
20.5 BCF + 3.2 MMBO
FARO 101 BOPD

Prospect: VR 253 Wells: 6 Date: 12/6/98 Status: FARO 101 BOPD Method Obtained: Swap CUMM. JUNE 2018 (8/8ths): 20.5 BCF + 3.2 MMBO Estimated Ultimate Recovery: 55 BCFE

VR 252
10.5 BCF + 16.7 MMBO
FARO 0.5 MMCFGPD + 454 BOPD

Prospect: VR 252 Wells: 9 Date: 3/11/95 Status: FARO 0.5 MMCFGPD + 454 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 10.5 BCF + 16.7 MMBO Estimated Ultimate Recovery: 17 MMBO

VR 172
2.2 BCF + 12 BC
P&A

Prospect: VR 172 Wells: 1 Date: 8/15/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.2 BCF + 12 BC Estimated Ultimate Recovery: Completed

SM 122
1.7 BCF + 5.3 MMBO
FARO 420 BOPD

Prospect: SM 122 Wells: 3 Date: 4/4/98 Status: FARO 420 BOPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 1.7 BCF + 5.3 MMBO Estimated Ultimate Recovery: 7.0 MMBO

SM 139
1.6 BCF + 1.7 MMBO
FARO 165 BOPD

Prospect: SM 139 Wells: 2 Date: 7/3/04 Status: FARO 165 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 1.6 BCF + 1.7 MMBO Estimated Ultimate Recovery: 2 MMBOE

SM 109
14.2 BCF + 202 MBO
P&A

Prospect: SM 109 Wells: 5 Date: 10/7/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 14.2 BCF + 202 MBO Estimated Ultimate Recovery: Completed

EI 177
8.6 BCF +49 MBO
P&A

Prospect: EI 177 Wells: 1 Date: 1/22/02 Status: P&A Method Obtained:Sale CUMM. PRODUCTION (8/8ths): 8.6 BCF +49 MBO Estimated Ultimate Recovery: Completed

EI 311/312
12.3 BCF + 39 MBO
FARO 0.01 MMCFGPD

Prospect: EI 311/312 Wells: 3 Date: 7/5/06 Status: FARO 0.01 MMCFGPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 12.3 BCF + 39 MBO Estimated Ultimate Recovery: 12.5 BCF

EI 47
14.1 BCF + 144 MBO
P&A

Prospect: EI 47 Wells: 2 Date: 10/2/98 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 14.1 BCF + 144 MBO Estimated Ultimate Recovery: Completed

EI 224
45.3 BCF + 677 MBO
FARO 25.8 MMCFGPD + 309 BOPD

Prospect: EI 224 Wells: 3 Date: 12/2/08 Status: FARO 25.8 MMCFGPD + 309 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 45.3 BCF + 677 MBO Estimated Ultimate Recovery: 60 BCFE

EI 264/271
5.2 BCF + 5 MBO
P&A

Prospect: EI 264/271 Wells: 1 Date: 12/25/99 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 5.2 BCF + 5 MBO Estimated Ultimate Recovery: Completed

EI 271
8.4 BCF + 18 MBO
P&A

Prospect: EI 271 Wells: 1 Date: 6/21/01 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 8.4 BCF + 18 MBO Estimated Ultimate Recovery: Completed

EI 98
2.1 BCF + 29 MBO
P&A

Prospect: EI 98 Wells: 1 Date: 7/12/00 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 2.1 BCF + 29 MBO Estimated Ultimate Recovery: Completed

SS 57
1.1 BCF + 52 MBO
P&A

Prospect: SS 57 Wells: 1 Date: 9/10/03 Status: P&A Method Obtained: 9/10/03 CUMM. PRODUCTION (8/8ths): 1.1 BCF + 52 MBO Estimated Ultimate Recovery: Completed

SS 59
6.2 BCF + 564 MBO
P&A

Prospect: SS 59 Wells: 2 Date: 5/17/98 Status: P&A Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 6.2 BCF + 564 MBO Estimated Ultimate Recovery: Completed

SS 189
113 BCF + 1.22 MMBO
FARO 7.5 MMCFGPD + 17 BOPD

Prospect: SS 189 Wells: 5 Date: 2/2/08 Status: FARO 7.5 MMCFGPD + 17 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 113 BCF + 1.22 MMBO Estimated Ultimate Recovery: 150 BCFE

PL 18
3.9 BCF + 22 MBO
S/I

Prospect: PL 18 Wells: 1 Date: 10/28/12 Status: S/I Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 3.9 BCF + 22 MBO Estimated Ultimate Recovery: 4 BCF

ST 239
5.0 BCF + 55 MBO
P&A

Prospect: ST 239 Wells: 1 Date: 10/1/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 5.0 BCF + 55 MBO Estimated Ultimate Recovery: Completed

ST 248
3.2 BCF + 363 BC
P&A

Prospect: ST 248 Wells: 1 Date: 5/15/02 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 3.2 BCF + 363 BC Estimated Ultimate Recovery: Completed

ST 311
11.7 BCF + 1.40 MMBO
FARO 10.3 MMCFGPD + 1246 BCPD

Prospect: ST 311 Wells: 1 Date: 5/21/13 Status: FARO 10.3 MMCFGPD + 1246 BCPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 11.7 BCF + 1.40 MMBO Estimated Ultimate Recovery: 130 BCFE

ST 127
26.4 BCF + 361 MBO
FARO 26.7 MMCFGPD + 487 BOPD

Prospect: ST 127 Wells: 1 Date: 1/27/13 Status: FARO 26.7 MMCFGPD + 487 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 26.4 BCF + 361 MBO Estimated Ultimate Recovery: 80 BCF

BRA 310L
14.1 BCF + 32 MBO
P&A

Prospect: BRA 310L Wells: 2 Date: 5/15/96 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 14.1 BCF + 32 MBO Estimated Ultimate Recovery: Completed

BRA 307L
10.9 BCF + 120 MBO
P&A

Prospect: BRA 307L Wells: 2 Date: 3/10/01 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.9 BCF + 120 MBO Estimated Ultimate Recovery: Completed

BRA 306L
5.4 BCF + 10 MBO
P&A

Prospect: BRA 306L Wells: 1 Date: 10/2/02 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 5.4 BCF + 10 MBO Estimated Ultimate Recovery: Completed

HI 206
41.7 BCF + 380 MBO
FARO 1.0 MMCFGPD

Prospect: HI 206 Wells: 3 Date: 1/1/03 Status: FARO 1.0 MMCFGPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 41.7 BCF + 380 MBO Estimated Ultimate Recovery: 45 BCFE

SM87/VR271
3.2 BCF + 78 MBO
FARO 1.2 MMCFGPD + 16 BOPD

Prospect: SM 87/VR 271 Wells: 2 Date: 5/28/14 Status: FARO 1.2 MMCFGPD + 16 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 3.2 BCF + 78 MBO Estimated Ultimate Recovery: 6 BCFE

ST 173
3.3 BCF + 11 MBO
P&A

Prospect: ST 173 Wells: 1 Date: 2/5/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 3.3 BCF + 11 MBO Estimated Ultimate Recovery: Completed

ST 72
0.7 BCF + 306 MBO
FARO 0.9 MMCFGPD + 343 BOPD

Prospect: ST 72 Wells: 1 Date: 3/30/14 Status: FARO 0.9 MMCFGPD + 343 BOPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 0.7 BCF + 306 MBO Estimated Ultimate Recovery: 2 MMBO

BRA 375 E/2
25.8 BCF + 70 MBO
P&A

Prospect: BRA 375 E/2 Wells: 1 Date: 6/6/94 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 25.8 BCF + 70 MBO Estimated Ultimate Recovery: Completed

ST 320
2.8 BCF + 969 MBO
FARO 2.4 MMCFGPD + 908 BOPD

Prospect: ST 320 Wells: 1 Date: 5/10/15 Status: FARO 2.4 MMCFGPD + 908 BOPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 2.8 BCF + 969 MBO Estimated Ultimate Recovery: 3 MMBO

EW 954
5.7 BCF + 857 MBO
FARO 6.3 MMCFGPD + 957 BOPD

Prospect: EW 954 Wells: 1 Date: 11/12/15 Status: FARO 6.3 MMCFGPD + 957 BOPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 5.7 BCF + 857 MBO Estimated Ultimate Recovery: NEW

Complete Discoveries List

Offshore Texas

Brazos

Prospect: BRA 306L Wells: 1 Date: 10/2/02 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 5.4 BCF + 10 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 307L Wells: 2 Date: 3/10/01 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.9 BCF + 120 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 310L Wells: 2 Date: 5/15/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 14.1 BCF + 32 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 375 W/2 Wells: 1 Date: 10/9/92 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 7.4 BCF + 28 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 375 E/2 Wells: 1 Date: 6/6/94 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 25.8 BCF + 70 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 376/375 Wells: 2 Date: 1/19/99 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 13.4 BCF + 32 MBO Estimated Ultimate Recovery: Completed

Prospect: BRA 504 Wells: 1 Date: 12/16/93 Status: P&A Method Obtained: Purchase CUMM. PRODUCTION (8/8ths): 10.5 BCF + 30 MBO Estimated Ultimate Recovery: Completed

Galveston

Prospect: GAL 210 Wells: 3 Date: 10/23/91 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 32.1 BCF + 186 MBO Estimated Ultimate Recovery: Completed

Prospect: GAL 227 Wells: 1 Date: 12/10/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.1 BCF + 46 MBO Estimated Ultimate Recovery: Completed

Prospect: GAL 225/239 Wells: 1 Date: 10/1/98 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 20.0 BCF + 58 MBO Estimated Ultimate Recovery: Completed

Prospect: GAL 239 N/2 Wells: 1 Date: 11/29/98 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 13.6 BCF + 781 MBO Estimated Ultimate Recovery: Completed

High Island

Prospect: HI 23L Wells: 1 Date: 4/19/08 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.4 BCF + 735 MBO Estimated Ultimate Recovery: Completed

Prospect: HI 24L Wells: 2 Date: 10/16/06 Status: FARO 6.5 MMCFGPD + 109 BOPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 77.4 BCF + 493 MBO Estimated Ultimate Recovery: 90 BCFE

Prospect: HI 37 Wells: 4 Date: 6/3/00 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 36.3 BCF + 77 MBO Estimated Ultimate Recovery: Completed

Prospect: HI 117 Wells: 1 Date: 11/2/13 Status: S/I Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.7 BCF + 3 MBO Estimated Ultimate Recovery: 3 BCFE

Prospect: HI 138 Wells: 2 Date: 6/20/08 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 35.6 BCF + 312 MBO Estimated Ultimate Recovery: Completed

Prospect: HI 154 S/2 Wells: 1 Date: 5/19/97 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 6.8 BCF + 95 MBO Estimated Ultimate Recovery: Completed

Prospect: HI 176 Wells: 1 Date: 1/17/11 Status: FARO 2.5 MMCFGPD + 101 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 5.6 BCF + 460 MBO Estimated Ultimate Recovery: 15 BCFE

Prospect: HI 194 Wells: 4 Date: 11/8/96 Status: P&A Method Obtained: Swap CUMM. PRODUCTION (8/8ths): 53 BCF + 252 MBO Estimated Ultimate Recovery: Completed

Prospect: HI 206 Wells: 3 Date: 1/1/03 Status: FARO 1.0 MMCFGPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 41.7 BCF + 380 MBO Estimated Ultimate Recovery: 45 BCFE

High Island South Edition

Prospect: HISA A-544 Wells: 2 Date: 7/13/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.2 BCF Estimated Ultimate Recovery: Completed

High Island East Edition

Prospect: HI 74 Wells: 2 Date: 12/12/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 4.5 BCF + 43 MBO Estimated Ultimate Recovery: Completed

Prospect: HI A-171 Wells: 1 Date: 2/25/12 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 1.0 BCF + 4 MBO Estimated Ultimate Recovery: Completed

High Island SE Edition

Prospect: HISA A-345 Wells: 1 Date: 5/30/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 6.2 BCF + 20 MBO Estimated Ultimate Recovery: Completed

Prospect: HISA A-354 Wells: 2 Date: 7/1/98 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 8.7 BCF + 39 MBO Estimated Ultimate Recovery: Completed

Prospect: HISA A-356 Wells: 1 Date: 2/10/98 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 6.3 BCF + 39 MBO Estimated Ultimate Recovery: Completed

Offshore Louisiana

West Cameron

Prospect: WC 77/96 Wells: 2 Date: 9/10/04 Status: FARO 10.4 MMCFGPD + 391 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 42.0 BCF + 623 MBO Estimated Ultimate Recovery: 60 BCFE

Prospect: WC 182 Wells: 2 Date: 10/14/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 28.0 BCF + 117 MBO Estimated Ultimate Recovery: Completed

Prospect: WC 230 Wells: 3 Date: 6/27/92 Status: P&A Method Obtained: Purchase CUMM. PRODUCTION (8/8ths): 10.3 BCF + 61 MBO Estimated Ultimate Recovery: Completed

West Cameron West

Prospect: WC 293 Wells: 2 Date: 9/3/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 17.4 BCF + 50 MBO Estimated Ultimate Recovery: Completed

Prospect: WC 294 Wells: 3 Date: 2/7/01 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 44.5 BCF + 296 MBO Estimated Ultimate Recovery: Completed

West Cameron South

Prospect: WC 522 Wells: 6 Date: 4/29/96 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 24.8 BCF + 226 MBO Estimated Ultimate Recovery: Completed

Prospect: WC 540 Wells: 4 Date: 5/23/97 Status: P&A Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 24.9 BCF + 16 MBO Estimated Ultimate Recovery: Completed

Prospect: WC 552 Wells: 5 Date: 5/7/94 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 82.4 BCF + 904 MBO Estimated Ultimate Recovery: Completed

East Cameron

Prospect: EC 34 Wells: 1 Date: 11/24/10 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 0.5 BCF + 18 MBO Estimated Ultimate Recovery: Completed

Prospect: EC 144 Wells: 1 Date: 5/23/00 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 10.9 BCF + 394 MBO Estimated Ultimate Recovery: Completed

Prospect: EC 149 Wells: 3 Date: 10/10/94 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 23.3 BCF + 80 MBO Estimated Ultimate Recovery: Completed

Vermilion

Prospect: VR 56 Wells: 1 Date: 3/8/00 Status: FARO 0.2 MMCFGPD + 92 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 4.8 BCF + 1.04 MMBO Estimated Ultimate Recovery: 15 BCFE

Prospect: VR 122 Wells: 3 Date: 2/26/03 Status: J&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 13.1 BCF + 335 MBO Estimated Ultimate Recovery: Completed

Prospect: VR 172 Wells: 1 Date: 8/15/04 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 2.2 BCF + 12 BC Estimated Ultimate Recovery: Completed

Prospect: VR 225 Wells: 2 Date: 7/24/97 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 9.6 BCF + 30 MBO Estimated Ultimate Recovery: Completed

Vermilion South

Prospect: VR 252 Wells: 9 Date: 3/11/95 Status: FARO 0.5 MMCFGPD + 454 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 10.5 BCF + 16.7 MMBO Estimated Ultimate Recovery: 17 MMBO

Prospect: VR 253 Wells: 6 Date: 12/6/98 Status: FARO 101 BOPD Method Obtained: Swap CUMM. JUNE 2018 (8/8ths): 20.5 BCF + 3.2 MMBO Estimated Ultimate Recovery: 55 BCFE

Prospect: VR 296 Wells: 1 Date: 5/8/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 13.9 BCF + 72 MBO Estimated Ultimate Recovery: Completed

Prospect: VR 309 Wells: 8 Date: 4/24/98 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 39 BCF + 388 MBO Estimated Ultimate Recovery: Completed

Prospect: VR 342/341 Wells: 3 Date: 5/14/06 Status: FARO 1612 BOPD + 1.0 MMCFGPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 2.1 BCF + 3.07 MMBO Estimated Ultimate Recovery: 5 MMBO

Prospect: VR 381 Wells: 2 Date: 5/24/00 Status: P&A Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 18.2 BCF + 368 MBO Estimated Ultimate Recovery: Completed

South Marsh Island South

Prospect: SM 87/VR 271 Wells: 2 Date: 5/28/14 Status: FARO 1.2 MMCFGPD + 16 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 3.2 BCF + 78 MBO Estimated Ultimate Recovery: 6 BCFE

Prospect: SM 109 Wells: 5 Date: 10/7/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 14.2 BCF + 202 MBO Estimated Ultimate Recovery: Completed

Prospect: SM 122 Wells: 3 Date: 4/4/98 Status: FARO 420 BOPD Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 1.7 BCF + 5.3 MMBO Estimated Ultimate Recovery: 7.0 MMBOE

Prospect: SM 139 Wells: 2 Date: 7/3/04 Status: FARO 165 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 1.6 BCF + 1.7 MMBO Estimated Ultimate Recovery: 2 MMBOE

Eugene Island

Prospect: EI 47 Wells: 2 Date: 10/2/98 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 14.1 BCF + 144 MBO Estimated Ultimate Recovery: Completed

Prospect: EI 98 Wells: 1 Date: 7/12/00 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 2.1 BCF + 29 MBO Estimated Ultimate Recovery: Completed

Prospect: EI 177 Wells: 1 Date: 1/22/02 Status: P&A Method Obtained:Sale CUMM. PRODUCTION (8/8ths): 8.6 BCF +49 MBO Estimated Ultimate Recovery: Completed

Prospect: EI 224 Wells: 3 Date: 12/2/08 Status: FARO 25.8 MMCFGPD + 309 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 45.3 BCF + 677 MBO Estimated Ultimate Recovery: 60 BCFE

Eugene Island South

Prospect: EI 264/271 Wells: 1 Date: 12/25/99 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 5.2 BCF + 5 MBO Estimated Ultimate Recovery: Completed

Prospect: EI 271 Wells: 1 Date: 6/21/01 Status: S/I Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 8.4 BCF + 18 MBO Estimated Ultimate Recovery: Completed

Prospect: EI 311/312 Wells: 3 Date: 7/5/06 Status: FARO 0.01 MMCFGPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 12.3 BCF + 39 MBO Estimated Ultimate Recovery: 12.5 BCF

Ship Shoal

Prospect: SS 57 Wells: 1 Date: 9/10/03 Status: P&A Method Obtained: 9/10/03 CUMM. PRODUCTION (8/8ths): 1.1 BCF + 52 MBO Estimated Ultimate Recovery: Completed

Prospect: SS 59 Wells: 2 Date: 5/17/98 Status: P&A Method Obtained: J/V CUMM. PRODUCTION (8/8ths): 6.2 BCF + 564 MBO Estimated Ultimate Recovery: Completed

Prospect: SS 189 Wells: 5 Date: 2/2/08 Status: FARO 7.5 MMCFGPD + 17 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 113 BCF + 1.22 MMBO Estimated Ultimate Recovery: 150 BCFE

South Pelto

Prospect: PL 18 Wells: 1 Date: 10/28/12 Status: S/I Method Obtained: Sale CUMM. JUNE 2018 (8/8ths): 3.9 BCF + 22 MBO Estimated Ultimate Recovery: 4 BCF

South Timbalier

Prospect: ST 72 Wells: 1   Date: 3/30/14   Status: FARO 0.9 MMCFGPD + 343 BOPD Method Obtained: J/V   CUMM. JUNE 108 (8/8ths): 0.7 BCF + 306 MBO Estimated Ultimate Recovery: 2 MMBO

Prospect: ST 127 Wells: 1 Date: 1/27/13 Status: FARO 26.7 MMCFGPD + 487 BOPD Method Obtained: F/I CUMM. JUNE 2018 (8/8ths): 26.4 BCF + 361 MBO Estimated Ultimate Recovery: 80 BCF

Prospect: ST 173 Wells: 1 Date: 2/5/93 Status: P&A Method Obtained: F/I CUMM. PRODUCTION (8/8ths): 3.3 BCF + 11 MBO Estimated Ultimate Recovery: Completed

South Timbalier South

Prospect: ST 239 Wells: 1 Date: 10/1/03 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 5.0 BCF + 55 MBO Estimated Ultimate Recovery: Completed

Prospect: ST 248 Wells: 1 Date: 5/15/02 Status: P&A Method Obtained: Sale CUMM. PRODUCTION (8/8ths): 3.2 BCF + 363 BC Estimated Ultimate Recovery: Completed

Prospect: ST 311 Wells: 1 Date: 5/21/13 Status: FARO 10.3 MMCFGPD + 1246 BOPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 11.7 BCF + 1.40 MMBO Estimated Ultimate Recovery: 130 BCFE

Prospect: ST 320 Wells: 1 Date: 5/10/15 Status: FARO 2.4 MMCFGPD + 908 BOPD Method Obtained: J/V CUMM. JUNE 2018 (8/8ths): 2.8 BCF + 969 MBO Estimated Ultimate Recovery: 3 MMBO

Ewing Bank

Prospect: EW 954 Wells: Date: 11/12/15  Status: FARO 6.3 MMCFGPD + 957 BOPD Method Obtained: J/V  CUMM. JUNE 2018 (8/8ths): 5.7 BCF + 857 MBO Estimated Ultimate Recovery: NEW